Case Study: Centro Elettromeccanico Bassanese achieves faster, more efficient cogeneration monitoring with Eaton automation

A Eaton Case Study

Preview of the Centro Elettromeccanico Bassanese Case Study

Centro Elettromeccanico Bassanese - Customer Case Study

Centro Elettromeccanico Bassanese (CEB), an Italian company specializing in electromechanical systems, needed a reliable monitoring and remote diagnostics solution for a high-performance natural gas cogeneration plant it built for a textile factory. The challenge was to avoid costly on-site technician visits for maintenance and diagnostics, which risked penalizing overall productivity with potential downtime.

Eaton provided a solution based on its SmartWire-DT intelligent wiring, the XV400 Micro Panel HMI PLC, and SLX9000 inverters. This technology simplified installation and enabled comprehensive remote monitoring. The results included an 85% reduction in wiring and commissioning time, significant savings on personnel and energy costs, and the ability to diagnose and solve problems remotely to maintain optimal production levels without interruptions.


Open case study document...

Centro Elettromeccanico Bassanese

Maurizio Bizzotto

Cheif Executive Officer


Eaton