Case Study: California Winery Achieves More Reliable HVAC Monitoring with E Tech Group

A E Tech Group Case Study

Preview of the California Winery Case Study

California Winery upgrades HVAC controls in 4 months with E Tech Group

E Tech Group was engaged by California Winery to upgrade the outdated HVAC controls in one of its largest production facilities. The legacy system was difficult to maintain, only supported local control, and required an upgrade that had to be completed with absolutely no operational downtime.

E Tech Group implemented a solution using Allen-Bradley ControlLogix PLCs, remote I/O, and an Ignition SCADA system, which was integrated with no interruption to the winery's operations. The results included new remote monitoring capabilities, mobile alerts for critical failures, and enhanced system reliability. E Tech Group successfully delivered the project in four months, building on a strong relationship that has since included several additional projects for the customer.


View this case study…

E Tech Group

74 Case Studies