Case Study: international almond supplier achieves a modernized, safer roasting line with E Tech Group

A E Tech Group Case Study

Preview of the International Almond Supplier Case Study

a international almond supplier restores roasting line in 4 months with E Tech Group

After a fire destroyed its automated roasting line, International Almond Supplier engaged E Tech Group to collaborate on a rebuild. The challenge was to replace and modernize the system, which previously required operators to work across two floors, with a solution that simplified the process and provided full visibility. The project demanded close coordination with architectural engineers on a tight schedule.

E Tech Group implemented a new automation system using CompactLogix PLCs and PanelView Plus HMIs for centralized control, alongside configuring network infrastructure. This solution allowed operators to start the entire line from a single location. The project was completed in about four months, significantly improving workplace safety, operational efficiency, and production visibility for International Almond Supplier, enabling them to resume production with a modernized roasting line.


View this case study…

E Tech Group

74 Case Studies