Case Study: a consumer-packaged goods giant boosts efficiency and uptime with E Tech Group’s PLC-5 migrations

A E Tech Group Case Study

Preview of the Consumer-packaged Goods Giant Case Study

A consumer-packaged goods giant completes 6 PLC-5 migrations in 3 days with E Tech Group

A consumer-packaged goods giant faced significant production disruption due to a network switch failure, a problem worsened by its reliance on legacy PLC-5 hardware. The automation partner, E Tech Group, was brought in to upgrade the control system to ControlLogix, which was necessary to implement Virtual Local Area Networks (VLANs) and prevent future widespread outages.

E Tech Group planned a phased upgrade, starting with the most critical six PLCs. The team executed the migration of these six systems over a 72-hour holiday weekend, utilizing conversion tools and maintaining existing network communications. This successful first phase, completed on time, resolved pre-existing logic issues and established a foundation for completing the remaining upgrades with improved efficiency, ultimately boosting the plant's uptime and operational reliability.


View this case study…

E Tech Group

74 Case Studies