Dynamix Group
21 Case Studies
A Dynamix Group Case Study
International Vehicle Manufacturing Company needed a way to protect its operations from costly outages, since even one hour of downtime could mean a loss of $125,000. Dynamix Group was brought in to design a high-availability and disaster recovery approach, using IBM eServer i5, Lakeview MIMIX HA1, and Dynamix Technical Services.
Dynamix Group implemented a tailored high-availability solution aligned to both business and IT requirements, combining hardware, software, and services to ensure continuous availability and complete disaster recovery. The result was zero unscheduled downtime over the last two years and performance that exceeded the client’s projected ROI.
International Vehicle Manufacturing Company