Dusty Robotics
16 Case Studies
A Dusty Robotics Case Study
RG Construction, a commercial wall and ceiling contractor, faced the challenge of ensuring perfect accuracy and coordination for a complex $420 million healthcare expansion project for the Cleveland Clinic. The project’s extensive use of prefabrication required seamless alignment between multiple trades to avoid costly rework and delays. To meet this challenge, they partnered with Dusty Robotics and implemented its automated layout solution.
By using Dusty Robotics' technology both in their prefab facility and on the jobsite, RG Construction laid out detailed, coordinated information for all trades directly onto the floor. This solution resulted in a layout process that was four times faster, a 50% reduction in on-site labor, and the entire framing schedule finishing four weeks ahead of plan. The accuracy provided by Dusty Robotics also led to higher quality installation and helped RG secure new contracts, including a project for the Mayo Clinic.
Luther Lampkin
Director of Technology and Innovation