Case Study: JE Dunn Construction achieves faster, more accurate multi-trade layout with Dusty Robotics

A Dusty Robotics Case Study

Preview of the JE Dunn Construction Case Study

JE Dunn Coordinates Four Trades on The Knoxville Temple with Dusty Robotics

JE Dunn Construction, a major domestic general contractor, faced the challenge of building a high-profile temple with tight schedule constraints and exceptionally high architectural accuracy standards. To meet this challenge, they turned to vendor Dusty Robotics and its automated layout solution to streamline the project's progress and coordinate multiple trades.

The solution from Dusty Robotics involved using their technology to perform multi-trade automated layout directly from the BIM model. This approach coordinated four different trades simultaneously, achieved a layout accuracy of 1/16 of an inch, and completed the layout process five times faster than traditional methods. For JE Dunn, Dusty Robotics resulted in significant time savings, reduced rework, enhanced on-site safety, and ensured the project met the owner's stringent quality standards without the need for corrective measures.


View this case study…