Case Study: Shawmut Design and Construction achieves real-time document collaboration with DryvIQ

A DryvIQ Case Study

Preview of the Shawmut Design and Construction Case Study

Shawmut Construction enables real-time collaboration with DryvIQ’s hybrid solution

Shawmut Design and Construction, a national construction management firm, faced a significant challenge in managing the enormous volume of documents for its complex projects. They needed a way to automatically synchronize and distribute files from their on-site Autodesk BIM 360 Field application to the Citrix ShareFile cloud platform to enable real-time collaboration with very specific access controls. The vendor DryvIQ provided a solution to integrate these systems.

DryvIQ implemented a hybrid solution that seamlessly integrated with Autodesk BIM 360. This allowed Shawmut to completely automate the distribution of project documents with simple point-and-click rules. The solution from DryvIQ decreased upload, processing, and data distribution time by over 96%, delivering mission-critical information in virtually real-time and significantly reducing project management overhead.


View this case study…

Shawmut Design and Construction

Joe Lombardi

Superintendent


DryvIQ

27 Case Studies