Case Study: Mortenson automates construction project management with DryvIQ

A DryvIQ Case Study

Preview of the Mortenson Case Study

Mortenson automates construction project management with Autodesk BIM 360 Field

Mortenson, a leading construction company, faced a challenge in automating the synchronization of content from their internal network file systems to their Autodesk BIM 360 Field project library. The manual process was slow and created significant data entry redundancy for their field engineers. They turned to vendor DryvIQ to find a solution for this workflow inefficiency.

DryvIQ implemented its connector to create an automated bridge between Mortenson's network drives and BIM 360 Field. This solution eliminated non-value-add steps, dramatically increased the speed of file access, and automated the entire workflow. As a result, Mortenson optimized its project management process and planned to expand its use of the DryvIQ connector to additional projects.


View this case study…

Mortenson

Ricardo Khan

Director of Integrated Construction


DryvIQ

27 Case Studies