Case Study: Winder Power reduces product lead time with DriveWorks Pro

A DriveWorks Case Study

Preview of the Winder Power Case Study

Winder Power shortens product lead time with DriveWorks Pro and adds new functionality every couple of months

Winder Power, a company specializing in the design and manufacture of power transformers, faced challenges with its order-based design process that relied on SOLIDWORKS, design tables, and equations. To improve this process, they implemented DriveWorks Solo and later upgraded to DriveWorks Pro from vendor DriveWorks.

The solution from DriveWorks allowed Winder Power to merge projects and automate the generation of models and drawings for various components. This resulted in significantly shorter design timeframes, reduced errors, and a more rigid design process. DriveWorks Pro enabled the company to decrease product lead times and build a fixed design methodology into their projects.


View this case study…

DriveWorks

122 Case Studies