Case Study: Winder Power reduces engineering and project lead times with DriveWorks

A DriveWorks Case Study

Preview of the Winder Power Case Study

Winder Power reduces product lead times with DriveWorks

Winder Power specializes in the design and build of transformers for the utilities and renewable energy sectors. Their challenge was reducing the engineering time and errors associated with their custom design-to-order process using SOLIDWORKS, design tables, and equations.

By implementing DriveWorks Pro, Winder Power automated the generation of models and drawings for key components based on standardized design rules. The solution from DriveWorks enabled them to design components in much shorter time frames with reduced errors, allowing them to offer customers a reduced product lead time.