Case Study: Blommaert achieves faster custom production and retained engineering knowledge with DriveWorks

A DriveWorks Case Study

Preview of the Blommaert Case Study

Blommaert cuts order-to-production time from 3-4 days to 2-3 hours with DriveWorks

Blommaert Aluminium, a manufacturer of custom aluminum solutions based in Belgium, faced the challenge of lengthy design times for custom products and the risk of losing critical engineering knowledge as senior staff retired. They partnered with vendor DriveWorks to implement its design automation and product configurator solutions to address these issues.

By using DriveWorks to automate their SOLIDWORKS designs, Blommaert achieved a dramatic reduction in their production startup time from 3-4 days down to just 2-3 hours. The DriveWorks solution also successfully captured the knowledge of retiring engineers into a rules-based system, preventing errors, ensuring consistent product assembly, and maintaining quality standards.


View this case study…

DriveWorks

122 Case Studies