Case Study: Shotton Group cuts sales document production time from half a day to 30 minutes with DriveWorks

A DriveWorks Case Study

Preview of the Shotton Group Case Study

Shotton Group cuts sales document time from half a day to 30 minutes with DriveWorks

The Shotton Group, a family-owned business and manufacturer of custom lifts, faced challenges with manually configuring orders and generating sales documents. Their process was time-consuming, prone to error, and resulted in data duplication. They sought a solution from vendor DriveWorks to automate these repetitive engineering and sales tasks.

By implementing DriveWorks, Shotton automated the configuration of its custom lifts. The solution streamlined the generation of engineering drawings, quotes, and bills of materials. The measurable impact was significant: DriveWorks helped reduce the time taken to produce sales documents from half a day to just 30 minutes, greatly reduced human error, and eliminated data duplication.


View this case study…

DriveWorks

122 Case Studies