Case Study: Oasis Trailer Mfg Ltd saves time on custom trailer design with DriveWorksXpress

A DriveWorks Case Study

Preview of the Oasis Trailer Mfg Ltd Case Study

Oasis Trailer Mfg Ltd cuts trailer design time from 20 minutes to 5 with DriveWorks

Oasis Trailer Mfg Ltd, a manufacturer of custom trailers, faced the challenge of time-consuming repetitive design work when creating manufacturing drawings for custom trailer axles. To speed up this process, they implemented DriveWorksXpress, a solution included for free inside SOLIDWORKS.

Using DriveWorksXpress, they created a simple input form that automates requirements and drives their SOLIDWORKS model. This solution from DriveWorks cut the time for these design tasks from 20 minutes down to just 5 minutes, saving significant time and effort while allowing the team to focus on more important, high-value custom design work.


View this case study…

DriveWorks

122 Case Studies