Case Study: Oasis Trailer Mfg Ltd reduces design time by 75% with DriveWorksXpress

A DriveWorks Case Study

Preview of the Oasis Trailer Mfg Ltd Case Study

Oasis Trailer Mfg cuts design time by 75% with DriveWorks

Oasis Trailer Mfg Ltd, a manufacturer of custom trailers, faced a challenge in their design process. Creating new SOLIDWORKS manufacturing drawings for each unique trailer configuration was a repetitive and time-consuming manual task. They sought a solution from DriveWorks to automate this process and speed up their design work.

DriveWorks implemented its DriveWorksXpress solution to automate the design process. By creating a simple input form with rules to drive their SOLIDWORKS models, the vendor enabled the automatic generation of new drawings. This solution resulted in a 75% reduction in design time, cutting a 20-minute task down to just 5 minutes, which allowed the team to focus on higher-value custom design work.


View this case study…

DriveWorks

122 Case Studies