Case Study: Liftech Group reduces crane drawing time from 4 days to 10 minutes with DriveWorks

A DriveWorks Case Study

Preview of the Liftech Group Sdn Bhd Case Study

Liftech Group cuts crane drawing time from 4 days to 10 minutes with DriveWorks

Liftech Group Sdn Bhd, a manufacturer of heavy lifting equipment, faced a labor-intensive and error-prone process where generating custom crane drawings manually took up to four days. To optimize this process and improve customer response times, they turned to the vendor DriveWorks and implemented its design automation technology.

By implementing DriveWorks, Liftech automated the generation of crane drawings. This solution streamlined the workflow between their sales and technical teams, allowing drawings to be produced in less than 10 minutes instead of days. This dramatic time savings enabled Liftech to send accurate documents to customers faster and allowed engineers to focus on more specialized projects.


View this case study…