Case Study: GH Cranes reduces design time and improves accuracy with DriveWorks

A DriveWorks Case Study

Preview of the GH Cranes Case Study

GH Cranes reduces design errors by 25% and cuts design time 50% with DriveWorks

GH Cranes, a leading global manufacturer of customized cranes, needed to manage complex product configurations and meet increasing market demand to support their global expansion. To address this challenge, they implemented design automation technology from DriveWorks.

Using DriveWorks, GH Cranes built a 3D configurator that automatically generates complex SOLIDWORKS assemblies and seamlessly integrates with their internal processes. This solution from DriveWorks resulted in a 50% reduction in design time and a 25% overall reduction in design errors, saving time and money while allowing engineers to focus on innovation.


View this case study…

DriveWorks

122 Case Studies