CHL Systems cuts conveyor design time from 40+ hours to 8–12 hours with DriveWorks

The customer, CHL Systems, a design/build system integration company, faced the challenge of lengthy design times for custom conveyor systems, which could take over 40 hours. To address this, they implemented DriveWorks Pro starting in 2018 with the goal of significantly reducing this time.

By implementing the solution from DriveWorks, CHL Systems successfully automated their design process. They started by automating subassemblies and progressed to configuring entire conveyors. This resulted in massive time savings, reducing their design time from over 40 hours down to just 8-12 hours per project.