John Holland, a leading engineering contractor in Australia, faced significant inefficiencies in its document control process for a major infrastructure project, the Westconnex Rozelle Interchange. Their traditional, paper-based markup system for reviewing up to 200 construction drawings at a time was causing wasted admin time and inaccuracies. The vendor, Drawboard, provided its Drawboard Projects solution to address this challenge.
By implementing Drawboard Projects, John Holland streamlined its redlining and drawing documentation process. The solution integrated seamlessly with their existing Aconex system and offered powerful tools like layers for simultaneous markups by different engineers. This resulted in a much simpler review process, significant improvements in daily workflow efficiency, and positive feedback from the team. The success on the Rozelle Interchange project gave John Holland a competitive advantage, saving time and money, and positioned Drawboard Projects for wider adoption across the company.
Garry Millgate
Quality Manager