Case Study: Boom Supersonic achieves streamlined production and reduced rework with Dozuki

A Dozuki Case Study

Preview of the Boom Supersonic Case Study

Focusing on Production Efficiency With Dozuki

Boom Supersonic needed a fast, easy-to-deploy way to deliver standardized work instructions to the shop floor as a startup — most procedures hadn’t been created and the engineering team couldn’t afford inefficiency. Lead Manufacturing Engineer Ryan Bocook evaluated options and chose Dozuki for its purpose-built, intuitive platform rather than complex MES tools or ad-hoc PowerPoint documents.

Dozuki enabled engineers and floor technicians to quickly create work instructions (including SolidWorks parts and drawings), use automated approval workflows, and delegate document creation without formal training, eliminating a production bottleneck. By using Dozuki’s platform Boom reduced rework and downtime, streamlined documentation and quality control, and gained the capacity and confidence to stay on track for on-time delivery of their first 30 aircraft.


Open case study document...

Boom Supersonic

Ryan Bocook

Lead Manufacturing Engineer


Dozuki

18 Case Studies