Dozuki
18 Case Studies
A Dozuki Case Study
Boom Supersonic needed a fast, easy-to-deploy way to deliver standardized work instructions to the shop floor as a startup — most procedures hadn’t been created and the engineering team couldn’t afford inefficiency. Lead Manufacturing Engineer Ryan Bocook evaluated options and chose Dozuki for its purpose-built, intuitive platform rather than complex MES tools or ad-hoc PowerPoint documents.
Dozuki enabled engineers and floor technicians to quickly create work instructions (including SolidWorks parts and drawings), use automated approval workflows, and delegate document creation without formal training, eliminating a production bottleneck. By using Dozuki’s platform Boom reduced rework and downtime, streamlined documentation and quality control, and gained the capacity and confidence to stay on track for on-time delivery of their first 30 aircraft.
Ryan Bocook
Lead Manufacturing Engineer