Case Study: Olympic Park, London achieves reliable, durable door control for millions of visitors with dormakaba

A dormakaba Case Study

Preview of the Olympic Park, London Case Study

Olympic Park, London - Customer Case Study

Olympic Park, London faced the challenge of equipping the London 2012 venues to handle over 9 million spectators and a global TV audience while ensuring safe, reliable access across multiple sites. dormakaba was selected to provide premium access solutions, supplying 2,500 door closers, 150 items of panic hardware, multiple automatic doors and a range of glass fittings to meet the event’s demanding needs.

dormakaba implemented high-quality door controls chosen for their compact, elegant design, long-term durability and ability to withstand constant heavy use, ensuring efficient and reliable closing across the major venues. The result was robust, low-maintenance access throughout Olympic Park, London—measurable by the scale of the deployment (2,500 door closers and 150 panic devices) and the systems’ performance under the intense usage of the Games.


Open case study document...

dormakaba

152 Case Studies