Fairview Baptist Church in Greer, SC had outgrown a 40‑year‑old facility and built a new $12 million, 149,000 sq ft campus with a 1,500‑seat worship center. The congregation needed durable, ADA‑compliant, secure and visually compatible door hardware for high‑traffic worship, administrative and fellowship spaces. dormakaba supplied architectural access solutions, including 8600 door closers, 9000 exit devices, CL700 cylindrical locksets and the SKC serialized key control system.
dormakaba’s hardware was installed throughout the campus to provide ADA accessibility, heavy‑duty durability, enhanced safety and simplified key management. The result is code‑compliant, long‑lasting openings that withstand high traffic, blend with the building’s finishes, and support secure, easy use across the 1,500‑seat worship center and 14,200 sq ft fellowship hall.