Disguise
190 Case Studies
A Disguise Case Study
The customer, Lightborne, faced the challenge of designing and previzualizing complex projection and LED effects for the massive, high-stakes Super Bowl XLIX Halftime Show. They needed to accurately simulate the final look of their content for the stadium environment well before arriving on site for the extremely limited rehearsal period. They utilized a Disguise 4x4pro media server as a key pre-production tool to meet this challenge.
Disguise provided a comprehensive solution for the entire production. Their 4x4pro media servers were used to control the projection mapping across the field and the LED stage during the live show. For pre-production, Lightborne used Disguise to create a pixel-accurate simulation of the stadium, which saved enormous time by eliminating the need to re-render content once on site. The vendor's QuickCal and Dynamic Blend features also drastically reduced the time required to calibrate 80 projectors, with technicians able to realign them in batches in under seven minutes. This allowed for the successful execution of the most-watched Super Bowl halftime show to date, seen by 118.5 million viewers.
the Super Bowl XLIX halftime show production