DISCO
46 Case Studies
A DISCO Case Study
An electrical contractor was faced with an overdue subpoena from the Department of Transportation and needed to quickly produce documents from a collection of over 250,000 items. The challenge involved complicated review requirements, including data segregation and complex responsiveness standards, all under a tight deadline. In conjunction with their outside counsel, the contractor engaged DISCO Review to address this challenge.
Utilizing DISCO's powerful search tools, metadata filters, and AI, outside counsel was able to systematically reduce the document collection from 256,000 to a 101,000 document review population. The DISCO team identified 96% of all responsive documents after reviewing only 40% of the collected data. This approach saved the contractor over $100,000 in review costs and successfully met the subpoena's timeline.
An Electrical Contractor