Case Study: IREX Contracting Group saves $150,000 annually with Digital Time Capture

A Digital Time Capture Case Study

Preview of the IREX Contracting Group Case Study

Industrial Specialty Contractor Saves $150,000 Annually

IREX Contracting Group, a large contracting organization with over 30 North American locations, struggled to standardize its time and payroll data capture. Their ERP system lacked the flexibility to handle multiple subsidiaries and project environments, leading them to rely on inefficient paper-based solutions and spreadsheets at an annual cost of $175,000. To solve this, they turned to vendor Digital Time Capture.

Digital Time Capture implemented its flexible, project-centric model, which provided a single standardized system that could be configured to meet the specific requirements of each project and subsidiary. As a result, IREX now captures all time and payroll data for its 12 subsidiaries and 55 branch offices in DTC, validating it before submission to JD Edwards for payroll. This solution saves the company $150,000 annually.


Open case study document...

Digital Time Capture

4 Case Studies