DiGiCOR
66 Case Studies
A DiGiCOR Case Study
St Andrew's Toowoomba Hospital faced challenges with its primary storage system, which resulted in downtime and performance drops, and its aging, unsupported server hardware. The hospital engaged DiGiCOR to improve its IT infrastructure and disaster recovery system for its critical Enterprise Patients Administration System (EPAS).
DiGiCOR implemented a two-phase solution utilizing NexentaStor's ZFS technology to create a highly available storage environment and replaced outdated nodes with cost-effective Citrix and Microsoft systems. This solution provided SATH with massive scalability, improved data backup and recovery, and extensive time and money savings. DiGiCOR delivered a hardware-agnostic solution that maximized the hospital's return on investment and future-proofed its storage requirements.