Case Study: PPL Power Generation Facility saves energy and reduces maintenance with Dialight LED obstruction lighting

A Dialight Case Study

Preview of the PPL Power Generation Facility Case Study

PPL Power Generation Facility cuts obstruction lighting energy use by 90% with Dialight

PPL Power Generation Facility, a power plant in Pennsylvania, faced high energy and maintenance costs from its outdated Xenon obstruction lighting on two chimney stacks. The facility needed a more efficient and reliable solution to meet FAA regulations while reducing its environmental impact. They turned to vendor Dialight for its LED obstruction lighting products.

Dialight implemented its L864/L865 dual LED obstruction fixtures, which use 90% less energy than the previous system. The solution drastically cut annual maintenance costs from approximately $12,000 and provided reliable, long-term performance that ensures FAA compliance. Dialight's LEDs also enhanced safety for both workers and migratory birds, supporting the plant's broader environmental and safety initiatives.


View this case study…

Dialight

77 Case Studies