A Dialight Case Study
The Port of Tilbury required a lighting solution for its new bulk grain storage facility that could withstand hazardous Zone 2 classified areas with combustible dust, harsh marine conditions, and complex operational needs including high mounting positions and crane movements. The port engaged its existing vendor, Dialight, to develop a comprehensive and safe lighting scheme for the project from the outset.
Dialight collaborated closely with the principal contractor to design a tailored solution using its ProSite Floodlights and SafeSite luminaires. Through application-specific engineering, Dialight optimized the design for the grain store, reducing the number of proposed fixtures by approximately 29% while still achieving the required light levels. The final installation of over 200 Dialight LED luminaires provides a robust, reliable, and maintenance-efficient lighting system built to support the port's operations for years to come.