Oxigen, a waste and recycling facility in Ireland, faced a significant safety and operational challenge due to poor visibility in its recycling shed. The existing 400W metal halide lights had mostly failed or deteriorated and were difficult to replace, forcing workers to rely on machinery headlamps. Seeking a more efficient solution, Oxigen worked with vendor Dialight to address this problem.
Dialight implemented its DuroSite® 150W LED high bays to replace the old lighting. The solution dramatically improved visibility, making the area three times brighter, and enhanced safety for workers. This switch resulted in a 68% reduction in lighting energy consumption and cost for Oxigen. Dialight's LEDs also provided a long lifespan and a 5-year warranty, which eliminated ongoing maintenance concerns.