Design Master Software
89 Case Studies
A Design Master Software Case Study
Hill Electric Company, a new electrical contracting firm, faced the challenge of efficiently producing accurate electrical design drawings and schedules for commercial projects using manual, time-consuming methods in AutoCAD, Word, and Excel. This process was highly susceptible to errors and required extensive rework whenever project changes occurred from architects. The company turned to Design Master Software for a solution.
By implementing Design Master's software, Hill Electric automated its drafting and scheduling processes, which dramatically reduced the time required to complete projects. On a typical multi-story building, what used to take 40-60 hours for initial drawings and another 6-10 hours for revisions was reduced to under 16 hours for the initial design and under 3 hours for corrections. This increase in efficiency and productivity provided by Design Master allowed the small but experienced team to be far more cost-effective and competitive.
Hill Electric Company
Richard Dennehy
Hill Electric Company