Case Study: Building Center No. 3 achieves greater control over electrical design with Design Master Electrical

A Design Master Software Case Study

Preview of the Building Center No. 3 Case Study

Building Center No. 3 Controls More of the Process with Design Master Electrical

The architectural firm Building Center No. 3, seeking to bring electrical engineering in-house for greater control and profitability on smaller projects, was previously reliant on manual drafting and inefficient calculators. They turned to the ElectroBIM product from Design Master Software to find a more effective and affordable solution.

By implementing Design Master Electrical, the firm gained the ability to efficiently calculate loads, size wires and breakers, and generate high-quality, fully customizable panel schedules. This solution from Design Master Software gave Building Center No. 3 complete control over the electrical design process, allowing them to eliminate outside consultants, streamline their workflow, and produce trusted, professional-grade engineering documentation.


View this case study…

Building Center No. 3

Jason Tapia

Founder


Design Master Software

89 Case Studies