Case Study: ENERGY Transportation Group achieves reliable real-time freight visibility and improved carrier compliance with Descartes MacroPoint

A Descartes MacroPoint Case Study

Preview of the ENERGY Transportation Group Case Study

Energy Transportation Group (3PL) Enhances Carrier & Customer Relationships with Descartes MacroPoint Real-time Freight Visibility

ENERGY Transportation Group, a Montreal-based asset-backed 3PL serving temperature-controlled food, FEMA emergency supplies and time-sensitive deliveries across the U.S. and Canada, needed reliable real-time freight visibility. After switching to a lower-cost visibility provider they faced frequent system outages, poor ELD and mobile adoption, connectivity gaps and manual tracking, which undermined carrier compliance and on-time performance.

ENERGY reverted to Descartes MacroPoint to regain stable ELD and mobile connections and continuous load tracking. The solution restored carrier buy-in and driver adoption, improved carrier compliance and on-time delivery, provided predictive ETAs for customers, and increased productivity and strategic carrier partnerships.


Open case study document...

ENERGY Transportation Group

David Grassi

Vice President Operations


Descartes MacroPoint

35 Case Studies