Case Study: Power Design Resources achieves 99.7% order accuracy with Deposco

A Deposco Case Study

Preview of the Power Design Resources Case Study

Power Design Resources builds on innovation and increases order accuracy to 99.7% with Deposco

Power Design Resources is a St. Petersburg, Florida-based design-build multi-trade contractor that pre-kits materials and products for job sites. Before implementing Deposco, its ERP-based inventory fulfillment did not give the team enough data to monitor operations or improve accuracy, which led to costly construction delays and reports of missing materials on site.

With Deposco’s warehouse management system, Power Design Resources used cycle counting to raise order accuracy to 99.7% and operate four times more efficiently. Deposco’s image scanning also let the team confirm what was actually sent onsite, helping reduce confusion and showing clients exactly how many pallets and materials left the warehouse.


View this case study…

Power Design Resources

Shea Tully

Vice President of Operations


Deposco

30 Case Studies