Deposco
60 Case Studies
A Deposco Case Study
ITB Fulfillment, a third-party logistics provider (3PL), was struggling with frequent outages from their prior warehouse management system (WMS). These outages paralyzed operations, forcing them to use paper-based methods that led to backlogs, missed shipments, and errors that damaged client relationships. They needed a reliable and efficient WMS solution from Deposco to handle their increasing order volume.
Deposco implemented a fully automated, cloud-based WMS solution in under eight weeks. The system streamlined order processing with barcodes and handheld devices, and integrated directly with client systems like Shopify. As a result, ITB Fulfillment increased its package throughput by 9 times within a year without increasing staff size, achieved 100% uptime, and reduced its error rate to less than 1%.