Delphix
38 Case Studies
A Delphix Case Study
A Fortune 1000 high‑tech semiconductor manufacturer that runs nearly every SAP module faced rapid demand growth and needed to accelerate application delivery without becoming an IT bottleneck. Complex SAP changes required multiple coordinated environments and full database copies—its SAP landscape had 7 applications on 10 Oracle databases (4.8 TB production), and provisioning a single project test environment could take up to 80 hours, limiting IT to two concurrent projects.
By deploying Delphix database virtualization the company increased project capacity to 11 concurrent projects (≈550% growth), cut full-database provisioning from hours to minutes (average ~3 minutes), and saved over 3,000 hours in six months. The firm also reduced storage for 45 virtual databases to 2.7 TB versus 30.5 TB previously (91% reduction), achieved a 200% payback, eliminated cross-team dependencies, and gained built‑in data protection for rapid rollback and uptime.
Leading High Tech Manufacturing Company
S. Ganesh
Senior IT Manager