DELMIAworks
38 Case Studies
A DELMIAworks Case Study
Nissen Chemitec America, a leading plastic injection molder supplying automakers like Honda, Toyota and Ford, struggled to advance lean manufacturing because its legacy AS/400 and subsequent ERP systems were cumbersome. Multiple databases, heavy manual data entry, slow modem-based EDI, and spreadsheet scheduling blocked efficiency, drove high EDI costs ($3,200–$3,600/month) and produced 30–40 shipping errors per month. The company needed a scalable, automotive-compliant ERP that understood plastics manufacturing specifics (family molds, multiple cavitations) while supporting labeling, EDI and quality requirements.
Nissen implemented EnterpriseIQ (IQMS/DELMIAWORKS) with embedded EDI, RealTime Production Monitoring, finite scheduling and integrated quality management—one single-database system that automated data flow and shop-floor visibility. Results included roughly 90% lower EDI costs (~$300/month), elimination of shipping errors, more than 70% reduction in maintenance costs, removal of redundant data entry, faster communication and scheduling, and secured additional business from its largest customer.
Mike Hopkins
Production Material Control and MIS Manager