Case Study: Pintos achieves higher production control and delivery reliability with Delfoi Planner

A Delfoi Case Study

Preview of the Pintos Case Study

A digital leap toward more efficient production with Delfoi Planner

Pintos Oy, a Finnish manufacturer of steel reinforcements and wire mesh, faced growing complexity in production control due to an increase in product variants and customer-specific customization. Their heavy reliance on manual planning and an ERP system made it impossible to manage capacity or coordinate between their three factories. This drove their need for a modern and scalable planning solution, which they found with vendor Delfoi and its Delfoi Planner product.

Delfoi implemented its Planner solution, which was integrated with Pintos's new ERP and MES systems to serve as the core of a centralized production control model. This provided transparency and control, enabling efficient capacity utilization across all plants. As a result of the solution from Delfoi, Pintos achieved exceptional delivery reliability, consistently exceeding 95% and reaching up to 98% annually.


View this case study…

Pintos

Jaakko Reunanen

Development Manager


Delfoi

14 Case Studies