Case Study: Daher Improves Operational Performance with DCbrain

A DCbrain Case Study

Preview of the DAHER Case Study

DAHER boosts productivity and reduces FTEs with DCbrain

DAHER, an aerospace equipment manufacturer and logistics service provider, faced challenges in optimizing its complex intralogistics operations which were planned manually. This process could not integrate their many operational requirements, leading to lost optimization potential. To meet its business efficiency challenges and improve productivity, DAHER entered into a strategic partnership with DCbrain.

DCbrain implemented its solution to create a digital twin of DAHER's logistics, enabling the simple integration of schedules and requirements several times a day. This provided visualization of the schedule, tracking of lead times, and optimal scaling of resources. The results included an increase in productivity, a reduction in the number of FTEs, and the full digitalization of planning operations, moving from manual processes to an automated mode.


View this case study…

DCbrain

11 Case Studies