Case Study: YESSS Electrical achieves 15-minute RTO with Dbvisit Standby

A Dbvisit Case Study

Preview of the YESSS Electrical Case Study

Yesss Electrical achieves an RTO of 15 minutes with Standby

YESSS Electrical, the UK's fastest-growing electrical wholesaler, needed a disaster recovery solution for its mission-critical Oracle database. Their challenge was to ensure their central management system remained available 24/7 and to prevent performance impacts from mobile application users, all while retaining their existing Oracle Standard Edition infrastructure. They engaged their partner, Red Stack, to find a solution involving vendor Dbvisit.

The solution implemented was Dbvisit Standby, which created a physically replicated, geographically dispersed standby database. This provided YESSS with a resilient disaster recovery setup that was quick to install using online training. The results were highly successful: Dbvisit achieved a Recovery Point Objective (RPO) of 15 minutes with minimal data loss, ensuring the central management system remains protected and available.


View this case study…

YESSS Electrical

Simon Pritchard

Oracle Database Administrator


Dbvisit

9 Case Studies