Case Study: United Infrastructure Group achieves faster billing and $210K in recovered revenue with Datumate DatuBIM

A Datumate Case Study

Preview of the United Infrastructure Group, Inc Case Study

United Infrastructure Group cuts billing cycles from weeks to days with Datumate and unlocks $210K in revenue

United Infrastructure Group, Inc. (UIG), a major civil contractor, faced challenges with labor-intensive workflows on complex infrastructure projects. Their reliance on manual quantity tracking and conventional tools led to slow billing cycles, discrepancies, and difficulties in validating work for pay applications. To address these issues, they turned to Datumate's DatuBIM platform for digital construction intelligence.

By implementing Datumate's DatuBIM, UIG integrated drone-captured data into a measurable 3D model of their job site. This solution provided automated volumetric calculations and progress tracking, which enabled faster, fact-based billing and eliminated disputes. The measurable impact was significant, including reducing billing cycles from weeks to days and uncovering an additional $210,000 in billable work that had previously gone unrecognized.


View this case study…

Datumate

12 Case Studies