ATS Construction, a Kentucky-based contractor working on the final phase of the Clays Mill Road improvement project, faced a complex urban roadway widening through a densely populated residential area with utility relocations, design-versus-field deviations, and heavy resident involvement that threatened delays and extra costs. To address these challenges they deployed Datumate’s cloud-native DatuBIM platform for digital construction analytics and project management.
Using Datumate’s DatuBIM, ATS provided stakeholder access, compared design versus digital as-built models, maintained a visual digital diary, and tracked progress and stockpiles in real time, improving transparency and collaboration across the project. The solution accelerated deviation detection, improved planning, reduced change orders and delays, and delivered measurable impacts: a 75% increase in collaboration, 40% time savings in deviation detection, and an 18% cost reduction.