Case Study: Taseko Gibraltar Mine saves time and money with dataPARC

A dataPARC Case Study

Preview of the Taseko Mines Case Study

Taseko Mines saves $160,000 and 1,000 hrs/yr with dataPARC

Taseko Mines, operator of the Gibraltar copper-molybdenum mine, faced significant data management challenges. Their operations required reviewing large amounts of process and lab data, which was manually entered into spreadsheets. This time-consuming and tedious process slowed down decision-making and made it difficult to share information. To address this, they turned to vendor dataPARC for a solution.

By implementing dataPARC's PARCview, Excel add-in, and task scheduler, Taseko Mines automated data entry and reporting. The solution integrated and visualized their data, eliminating manual logs and enabling automated shift reports. As a result, dataPARC helped the mine save an estimated 1,200 hours per year and $160,000 through improved process control and digitized reporting.


View this case study…

dataPARC

28 Case Studies