dataPARC
28 Case Studies
A dataPARC Case Study
Atlantic Power, an operator of multiple power generation facilities across the US and Canada, faced a forced migration when their long-time historian platform was scheduled for end of support. This threatened two decades of operational workflows and knowledge, while their geographically complex operations of ten sites suffered from limited visibility and data silos. They sought a solution to replace their historian and address these challenges.
dataPARC implemented a unified data infrastructure, connecting all ten sites to a single system. The solution provided enterprise-wide visibility, enabling multi-site trending on a single display—a capability Atlantic Power never had before. dataPARC's tools led to enhanced troubleshooting, seamless user adoption, and real-time monitoring for leadership. The migration was completed in one year, successfully turning a forced replacement into a strategic foundation for performance monitoring and continuous improvement.