Case Study: J&W Swiss Machine Boosts Production Efficiency with Datanomix

A Datanomix Case Study

Preview of the J&W Swiss Machine Case Study

Datanomix Fusion dials-up production efficiency for Swiss turning operation

J&W Swiss Machine, a precision machining shop, was focused on maximizing efficiency but lacked real-time, accurate data on their production floor performance. Their challenge was gaining visibility into machine activity and job status to improve consistency, predictability, and on-time delivery to their customers.

Datanomix implemented its production intelligence platform, which provided a live data feed from work cells without requiring operator input. The solution gave J&W Swiss Machine critical metrics like cycle time conformance and parts per hour, which were displayed on TVs throughout the shop. Using Datanomix, the company achieved a 13% increase in cycle time conformance, improved on-time delivery by 1.5 days on average, and increased overall factory throughput by 15%.


View this case study…

J&W Swiss Machine

Wayne Langlois

Owner


Datanomix

4 Case Studies