Case Study: Lawrence Livermore National Laboratory achieves six-fold engineering throughput and DOE-compliant enterprise configuration management with Dassault Systemes ENOVIA

A Dassault Systemes Case Study

Preview of the Lawrence Livermore National Laboratory Case Study

Relies on ENOVIA as it tackles pressing energy and nuclear operations challenges

Lawrence Livermore National Laboratory faced the challenge of managing hundreds of thousands of engineering, safety and legacy documents across multi-decade projects like the National Ignition Facility while meeting strict DOE configuration and compliance requirements. To address this, Lawrence Livermore National Laboratory turned to Dassault Systemes’ ENOVIA Engineering Central as the core of an Enterprise Configuration Management System.

Dassault Systemes implemented ENOVIA to provide a single digital source of truth for more than 1,600 users, integrating CAD, records, workflows and downstream systems. The ENOVIA-based solution boosted ERC throughput six‑fold, sped engineering changes five‑fold (ECOs from a week to a day), enabled automatic BOM transfer to ERP in seconds, and cut bid/quote assembly from a week to under a day.


Open case study document...

Lawrence Livermore National Laboratory

Bernie Merritt

NIF Configuration Management and Integrations Manager


Dassault Systemes

412 Case Studies