Case Study: Pol-Eko-Aparatura cuts development time by 50% with Dassault Systèmes' CATIA PLM Express

A Dassault Systemes Case Study

Preview of the Pol-Eko-Aparatura Case Study

Reduces development time by 50% with CATIA PLM Express

Pol-Eko-Aparatura, a 90-person Polish manufacturer of laboratory equipment, needed to speed time-to-market while keeping costs and quality steady. To address growing customer demand, the company adopted Dassault Systemes' CATIA PLM Express for its sheet-metal and assembly design work.

Dassault Systemes implemented CATIA PLM Express to provide in-context assembly design, a single master 3D model, and automated sheet-metal constraints; engineers learned the system in about a week. The solution eliminated costly redesigns, enabled early customer feedback on virtual prototypes, and cut development cycle times by 50%, increasing throughput and order capacity.


Open case study document...

Pol-Eko-Aparatura

Dawid Drapacz

Deputy Head, Production Department