Case Study: Bee Pitron Electric achieves 30% faster development with Dassault Systèmes’ ENOVIA SmarTeam

A Dassault Systemes Case Study

Preview of the Bee Pitron Electric Case Study

Bee Pitron Electric Reducing development time by 30% with ENOVIA SmarTeam

Bee Pitron Electric, a major Russian cable-network manufacturer serving aerospace, railway, defense and oil & gas markets, faced growing order backlogs and an expanding product line that required better concurrent engineering, unified design documentation and elimination of paper-based handoffs. To meet these challenges the company selected Dassault Systemes’ ENOVIA SmarTeam (alongside CATIA) as the foundation for a common, real-time design environment.

Dassault Systemes implemented an integrated solution based on ENOVIA SmarTeam—using SmarTeam Editor, Workflow and Program Management—to provide one database, revision control, automated workflows and MS Project integration for resource tracking. The new system improved coordination and data continuity across teams, eliminated transfer-related data loss, and boosted productivity by 30% while accelerating cost analysis and improving product quality.


Open case study document...

Bee Pitron Electric

V.I. Zhigulskikh

Deputy Director General, Production and Development


Dassault Systemes

412 Case Studies