Dakota Integrated Solutions
28 Case Studies
A Dakota Integrated Solutions Case Study
LiuGong, a global leader in construction machinery manufacturing, faced a significant challenge in reducing the lengthy time required for machine inspections at its UK facility, which took up to 90 minutes per item. The process was also inefficient and unsafe for workers who had to climb machines while handling clipboards and paperwork. To address this, they partnered with vendor Dakota Integrated Solutions to implement a voice-enabled maintenance and inspection solution.
Dakota Integrated Solutions implemented a voice-directed system using Honeywell technology, which guided inspectors through the process verbally, allowing for hands-free operation and the integration of photos into reports. This solution cut inspection time per machine by half, from 90 to just 45 minutes. It also improved worker safety, ensured 100% compliance, and enabled real-time, accurate report generation that could be instantly translated and sent to the company's headquarters in China.