D-Link
86 Case Studies
A D-Link Case Study
Abu Dhabi Mall, one of the UAE’s top-ranked shopping malls, needed to upgrade its network to keep up with rapidly growing visitor traffic and support collaborative platforms, future-proof technologies, and high-availability architecture. D-Link was selected to provide a cost-effective switching and storage solution, including the DGS-3620 Series xStack, DES-3800 Series X Stack, and D-Link Safeguard Engine™.
D-Link implemented a high-speed 10G backbone that gave Abu Dhabi Mall a flexible, scalable, and future-ready network infrastructure. The mall now benefits from 10Gbps data transmission speeds, enabling fast, reliable performance and room for future expansion while staying within budget.