The customer, a 700mw power plant, faced challenges with its obsolete DCS server system, which had poor performance from previous incorrect upgrades. Cybertrol Engineering was tasked with developing a solution to minimize downtime and provide long-term support for the sensitive operations.
Cybertrol Engineering designed and commissioned new SCADA infrastructure, implementing VMware vSphere for high availability and replacing aging hardware with centrally managed thin clients. The solution included a guarantee of 24/7/365 remote support. As a result, Cybertrol improved the plant's application performance and reliability, allowing routine maintenance to be completed without production downtime.
700mw Power Plant